Skip to content
ARTMİMhotel design group TR

In Antalya, nobody knewwhat interior architecture was.

A path of more than thirty-eight years: from an interior architecture office opened in Antalya to hotel projects in Türkiye and abroad.

1988— 2026

1988

Foundations are laid

ARTMİM's foundations are laid in Antalya with project drawing. At that time interior architecture was not yet a recognised profession in the city, and there was no craftsman who could read the drawn project. In time, production is taken up as well.

1990

Production grows

Production capacity increases. The small workshop in the old industrial estate gradually becomes a five- or six-storey production building; ARTMİM is now a firm that both designs and produces. As tourism investment accelerates, the team specialises in hotel buildings.

1998

First factory

Production moves to our first factory; woodworking, upholstery, marble and metal are brought together under one roof. In this building, which is now our loose-furniture factory, frames, upholstery, moulded polyurethane, metal and marble are produced.

2005

Large scale in Belek

The interior design of Kempinski The Dome Golf & Spa Resort is completed.

2008

Design office

When our previous building becomes too small, our current design office in Fener Mahallesi opens. It is the fifth office on a path that began in Bahçelievler.

2009

Mardan Palace

In Antalya, the local working drawings, fit-out and furniture production of Mardan Palace are completed.

2011

Maxx Royal Belek

The interior design of the main building and the Terrace Houses carries the ARTMİM signature. In the same year the interior design of Kempinski Hotel Badamdar in Baku is carried out.

2012

El Aurassi, Algeria

In Algeria, the local fit-out and furniture production of El Aurassi Hotel are completed.

2013

Main factory

Our main factory and head office, known for its white façade with a branch pattern, open. Panels, fixed joinery, part of the loose woodwork and the paint shop move there; frames, upholstery, moulded polyurethane, metal and marble continue at the first factory. The solar panels installed the same year now cover all the electricity consumed by our two factories.

2013

Istanbul

Hotel projects in Istanbul are completed with Shangri-La Bosphorus and Radisson Blu; CVK Park Bosphorus follows the next year.

2014

Rixos Premium Belek

In Belek, the interior design and interior fit-out of Rixos Premium Belek are completed.

2015

Bodrum and Istanbul

The interiors of Sirene Luxury Hotel in Bodrum and The St. Regis in Istanbul are completed.

2016

From Kyrenia to Side

The interiors of Elexus Hotel & Casino in Kyrenia and Barut Acanthus in Side are completed.

2020

Sheraton Jeddah

In Saudi Arabia, the interior fit-out of Sheraton Jeddah is completed.

2021

Mandarin Oriental Bosphorus

Production of Mandarin Oriental Bosphorus in Istanbul is completed.

2022

Cullinan Belek

The interior designs of Cullinan in Belek and Lara Barut in Kundu are completed.

2024

Regnum Carya

In Antalya, the interior design and furniture production of Regnum Carya Hotel are completed.

2024

Arta Kalan Zamanlar

G. Hakan Külahçı's first painting exhibition, “Arta Kalan Zamanlar”, opens in Antalya.

2025

Sofia and Budva

The interiors of Zenith Casino in Sofia and Merit Starlit Hotel & Casino in Budva, Montenegro, are completed.

2026

Two awards

Zenith Casino is awarded the Bronze A' Design Award in Italy; it is the first international competition ARTMİM has entered. In September the 6th International Diamond Awards in Istanbul add the award for Interior Architecture Brand of the Year (Hotel and Hospitality Projects).