Skip to content
ARTMİMhotel design group TR

From a small workshopto factories.

In our two factories in Antalya, we make every piece that goes into a hotel's interior ourselves.

We overseeproduction ourselves.

Design, engineering, manufacturing and installation sit within the same team. That is why we meet no surprises at handover.

Our large, experienced team, made up of the design office and the woodworking, upholstery, marble and metal workshops, produces the pieces a hotel needs to the dimensions in the drawing. In busy periods, installation teams on site join this set-up.

From a small workshopto two factories.

The small workshop in an old industrial estate grew over time into a production building of five or six storeys. When that was no longer enough, our first factory, for loose furniture manufacturing, was established in 1998; in 2013 our main factory and head office opened, with its white façade patterned with branches.

Today our main factory houses panel and fixed furniture production, part of the loose woodwork, and the paint shop; our loose furniture factory houses frame, upholstery, polyurethane, metal and marble production. Projects are drawn in our design office in the Fener district of Antalya.

Our solar panels, installed in 2013, cover all the electricity our two factories consume; our production runs entirely on green energy.

Factory coordination and finance are the responsibility of Gökhan Külahçı, industrial engineer.

Fourworkshops.

Designoffice.

Our interior architecture team approaches each hotel through its own story. Concept, layout and material decisions are made in this office, and an artistic design language is built to suit the character of the space and the needs of the operation. The approved design is prepared for production with plan, section and detail drawings. Every piece in the workshops starts from the dimension written on the drawing here.

Gallery01 11

Woodworkingworkshop.

Designed timber wall panels, solid-wood veneered panels, wall systems and fixed furniture are produced in this section. Drawings are transferred directly to the machining centres; panels are cut, drilled and milled to the dimensions in the drawing. Surfaces take their final form in the veneer presses and on the edge-banding and wide-belt sanding lines. All the timber we use is FSC-certified. Hundreds of parts that will fit together on site are prepared in the factory with the same precision.

Gallery01 15

Upholsteryworkshop.

Loose timber furniture takes shape in this workshop. The frames of the furniture a hotel uses, from lobby to room and from restaurant to poolside, such as armchairs, sofas, banquettes, headboards, chairs, stools, tables, coffee tables, bar counters and poufs, are built, assembled and checked here. Our craftsmen upholster the frames with padding, fabric and leather. The padding is also cast in this workshop, in polyurethane moulds of our own design; because we are not tied to ready-made foam forms, we can also produce amorphous seating with organic lines. We carefully produce the furniture, accessories and components a hotel needs from A to Z, from frame to upholstery.

Gallery01 12

Marbleworkshop.

In our marble workshop, slabs are selected one by one for each project. So that the veining continues unbroken across the designed space, slabs are matched according to the layout plan; cutting, edge profiles and polishing follow that plan. Floor and wall cladding, bathroom and vanity countertops, hammam and spa surfaces, basins and central hammam stones, reception and bar counters, stair treads, table tops and decorative details leave the workshop ready for installation.

Gallery01 09

Metalworkworkshop.

Work primarily in stainless steel and iron, as well as brass, bronze and aluminium, is produced in our metal workshop. Bar and shelving systems, balustrades, screens, architectural detail elements and the load-bearing metal frames of furniture take shape here. Sheet metal is cut to size by laser and plasma, and bent on the press brake; tubes are formed on the bending machine. After welding, grinding and polishing, PVD coating and electrostatic painting are also carried out in our own facility; parts leave ready for the point where they will meet timber and stone.

Gallery01 13

Certified production,clean energy.

Our production is carried out under ISO 9001 quality, ISO 14001 environmental, ISO 50001 energy and ISO 46001 water efficiency management system certificates.

All the timber we use is FSC-certified. For every project we obtain the fire-resistance certificates that hotel specifications require.

The 1 MW of solar panels on the roof of our main factory have covered all the electricity our two factories consume since 2013. Our production runs entirely on green energy.